Peat Installation


bulet SITE PREPARATION:
insall1
Prepare site as per approved plan layout drawing (prepared by a qualified engineer).  Scarify soil under the entire area of the base material.  Place base material (e.g. 6" clear stone) level and to a minimum thickness of 150mm.
rule
bulet OFF-LOADING:
insall2
Off-load Peat System with a crane or large excavator.  (Peat Module weight = 16,500lbs)  Lifting device is supplied by GS Concrete. Ensure the crane and truck may be parked close to the system location and have adequate access to the site, prior to delivery.
rule
bulet PLACEMENT:
insall3
Place peat module on prepared base material as per approved layout drawing.  It is recommended that the location of the modules be marked out prior to placement to ensure precise placement.
rule
bulet LEVELING:
insall4
During placement ensure that each peat module is level and adequate grade is provided to each module to maintain proper effluent flow through the system.  It is recommended that 600mm space be provided between the modules for easy of backfilling and mowing once the system is completed.
rule
bulet BACKFILL:
insall5
Place a 12" deep by 12" wide layer of base material around all sides of the modules. Then place a layer of filter fabric on top of all the base material. Backfill with loamy sand fill or approved on-site material to the underside of the pipe inlets. Compact soil under piping to prevent settlement.
rule
bulet DISTRIBUTION BOX:
insall6
Install the distribution box on level, compacted, free draining granular stone. Install outlet pipes and flow equalizers.  Adjust flow equalizers as per instructions provided with each adjustable weir.
rule
bulet CONNECTION PIPING:
insall7
When connecting pipes to peat modules ensure that a minimum grade of 2% is provided at all times and all joints are properly glued. Provide imported granular material under and around all pipes.
rule
bulet BACKFILLING COMPLETE:
insall8
Complete backfilling to within 3" of the top of the peat modules and remove shipping plastic.  Peat modules shall be planted with grass or shallow rooted plants to prevent erosion.
rule
Note: No fill material or on-site material shall be placed on the surface of the Peat Modules.